Bathroom, shower and Tub

  • Demolition (The “Tear-Out”)

  • Frame Inspection

Systems Installation (Rough-In)
  • Plumbing Rough-In

  • Electrical Rough-In

Shower Installation and Wall Finishe

Tub and shower : This is the most crucial step.

  • Waterproof

  • Shetroock

gray concrete wall inside building
gray concrete wall inside building
white and black abstract painting
white and black abstract painting
Tiling and Painting
  • Tile Installation: Tiles are laid on the shower/tub walls and the bathroom floor. This process includes grouting and sealing

  • Painting: The ceiling and non-tiled walls are prepped and painted

Final Fixture Installation

The bathroom is assembled and made fully functional

  • Vanity and Countertop: The vanity cabinet and countertop are installed

  • Final Plumbing: The sink, faucets, showerhead, and control valve are installed. The toilet is set and connected

  • Final Electrical: Light fixtures, the exhaust fan, and outlet/switch covers are installed

  • Finishing Touches: The mirror, towel bars, and any shower glass or enclosure are installed. Finally, silicone caulk is applied to all joints (around the tub/shower, sink, etc.) to seal them against water